Transformer Efficiency
The Harmonic Problem
The PQI Solution
Products
The PQI Calculator
Technology Demo
Specs & Drawings
Paper Articles
Case Studies
Welcome Video
Press Releases

Rep Opportunities
Employment
Add to Favorites
   

Home About Us What's New Frequently Asked Questions Contact Us

Project:
Date:
Facility Type:
Rating: kVA
Type of Project: New    End-of-life replacement    Mid-life replacement
ENGINEERING DATA
Y N Single Line Diagram(s) Included
Y N Panel Schedules Included
Y N Transformer Schedules Included
Y N Floor Plan or Minimum/Maximum Circuit Lengths
TRUE COST OF ENERGY
$/kWhr Using a typical monthly electric utility invoice, divide the total cost by the number of kWhrs consumed. NOTE: Include all taxes and other related energy charges.
$/kWhr In the absence of an actual electric bill, obtain monthly charges from the utility company that provides power in the geographical location of the proposed project. NOTE: Include all taxes and other related energy charges.
$/kW/month Demand Charge
AIR CONDITIONING
Geographical Area of the number of months per year the space air-conditioned (if transformer is installed in air-conditioned space)?
LOAD PROFILE (%FL)
%FL Daytime (average %FL for number of hours/segment) hrs/segment
%FL Evenings (average %FL for number of hours/segment) hrs/segment
%FL Weekends (average %FL for number of hours/segment) hrs/segment
Weeks per year, if any, the transformer has a no-load profile?
 
Submitted by:
Email Address:
Company Name:
Contact Phone:
 

© Copyright PowerQualityInternational.com - All Rights Reserved